B KO Hwaseong City (Talk IT)·Talk·

Citizens and civil servants build with AI: Hwaseong City's AI experiment (시민과 공무원이 AI로 직접 만든다! 화성시의 AI 혁신 실험)

B · Useful, limited Hwaseong City's big-data team lead reports his own programme on a tech talk show; candid contest-to-production counts and concrete rule changes, but all figures are the speaker's and none is measured on screen.

Summary based on the full transcript·Original: about 66 minutes to watch

In short

Shin Hwan-cheol, big-data team lead in Hwaseong City's AI Smart Strategy Office, speaks on Talk IT's public-sector AX series (17 November 2026). He opens with three numbers: 107 vibe-coded entries, 17 awards, 1 build in production. The talk is about the gap between them: who operates a tool after the prize, how errors are caught, and whether it survives the next staff rotation. The city's answer is to change its own rules: required output after training, the owning department chosen before the award, promotion points for builders.

Key numbers

  • 107 to 17 to 1vibe-coded contest entries, awards, and builds in actual use (AI Hwaseong Challenge, 23 September 2026)
  • 92 to 6 to 0entries, awards and builds put to use in the 2025 ideas-only contest
  • 20 of 40citizen AI instructors certified after first-half training; half failed by design
  • 3 days to about 1 hourtask time on the sanitation-administration platform built by three district staff (speaker's figure)

As reported by the source.

Watch the original on youtube.com

Korean·Video·opens youtube.com

What it reports

  • 2026 AI Hwaseong Challenge: citizen, university and civil-servant tracks; 107 entries, 17 awards, 1 in use; about five more are in security review for production. All but one of the 17 are being prepared for rollout.
  • 2025 contest took ideas only: 92 entries, 6 awards, none applied.
  • An internal contest now asks for a product requirements document instead of a demo; staff vote openly, 35 projects compete, the top 15 are taken toward production.
  • Training (the "AI Innovation School", four tracks) used to be counted in sessions and attendees; every course now ends with a compulsory build submission. Of 40 citizen instructors trained in the first half, 20 were certified.
  • Flagship build: a sanitation-administration platform (permits and self-diagnosis forms) made by three staff in a district hygiene complaints team; a 3-day task now takes about an hour.
  • Four barriers to production: system integration, personal and sensitive data, duplicate maintenance and cost, and slow adoption procedure. Conventional IT projects take about two years from plan to delivery.
  • HR rules amended on 30 October 2026 give certified AI champions 0.5 performance points; not retroactive. Research groups get up to 100,000 won a month for subscriptions; about 1bn won of national funding goes to a city data platform with a deployment area for staff-built tools.
  • Advice: decide the operating department before building; ask it before awarding; experiment freely but adopt through a simplified formal path; the AX team should not take the credit.

How they got it

A 66-minute livestream talk with a host and live audience questions. The transcript comes from cleaned Korean auto captions; some names and terms are garbled.

Limits

  • Speaker's own programme and figures; the 3-days-to-1-hour claim is not measured in the talk.
  • One city, with strong backing from the mayor (six specific instructions since June); results may not transfer.
  • Auto-caption errors remain in the transcript.

Why it matters for companies

Hackathons and AI contests in companies follow the same curve: many demos, few tools in use. Hwaseong's fixes are cheap and transferable: name the owning team before the prize, make training end in a submitted build, give the owning department credit, and give builders a career reason to keep going. Counting what reaches production, and publishing the 17-to-1 ratio, is the useful habit.

Key passages in translation

Korean original

17건이 과연 현업에 적용됐느냐? 아 좀 부끄럽지만 지금 적용이 되고 있는 것들은 한 건입니다.

English translation

Were the 17 actually put to work? It is a little embarrassing, but the number now in use is one.

Korean original

두 번째 경험은 상을 주기 전에 상 받은 뒤에 길을 고민을 해야 된다.

English translation

The second lesson: before giving the award, work out the path after the award.

Korean original

결국은 만든 사람이 책임을 지는 구조가 아니라 실제로 어 그 업무의 부서가 어 맡아서 해야 되는 게 핵심이라고 생각을 하고요.

English translation

The key is that the department that owns the work takes it on, rather than the person who built it carrying the responsibility.

Summary based on the full transcript. Read the original for the full argument and data.Watch the original on youtube.com

Tags

Same week

All of Week 47