Mels Seitov. Building AI-driven product development: lessons, mistakes and reality (Мэлс Сеитов. Строим AI-driven продуктовую разработку: уроки, ошибки и реальность)
B · Useful, limited First-hand account from the IT company of Kazakhstan's Bank CenterCredit of embedding agent flows across its delivery process, valuable for its candid failure list, but all figures are self-reported and early, with no quality or defect data.
Summary based on the full transcript·Original: about 44 minutes to watch
In short
A 44-minute conference talk (uploaded 9 November 2026) by a product-development leader at the IT company spun off from Kazakhstan's Bank CenterCredit, an organisation of about 1,000 people building banking products for 22-23 product teams. About six months earlier it set out to embed 33 agent "flows" across the delivery chain from idea to support. At the time of the talk 10 were in production, 11 in limited testing and 12 in development. The value of the talk is the list of what went wrong: standards written for humans, legacy with no decision memory, agents grouped by competence centre, prioritisation by local efficiency, no owner of the end-to-end result, and running it as a project rather than a product.
Key numbers
- 33agent flows planned across the SDLC; target to launch all by year end
- 10 / 11 / 12flows in production, in limited testing, and still in development at the time of the talk
- 23product teams using the production flows (22 teams mentioned elsewhere in the talk)
- 5,000 dollarscost of producing one technical specification, about 3 weeks, mostly rework loops
- 30%more valid test scenarios generated by AI than by one of the best test leads in a pilot comparison
As reported by the source.
Russian·Video·opens youtube.com
What it reports
- Internal standards (spec templates, document formats) were written for humans and had to be redesigned to be usable by agents.
- The bank is 38 years old; legacy code has no ADRs, decision history or links between artefacts. He proposes an "engineering memory" layer with versioned knowledge and data-quality control.
- Grouping agents by competence centre (analysis, development, QA) failed: outputs depend on each other, and context must flow from user story to acceptance criteria, components, API dependencies and tests.
- Prioritising by expected efficiency misled them: generating baseline code in minutes is useless without upstream requirements and architecture agents.
- Two agent types: generators (requirements, scenarios, code) and controls (gates that check a person's or an agent's output).
- Each role owned its stage; nobody owned whether the task entering the chain was delivered correctly at the end.
- The effort started as a project with a manager and no product owner; feedback forced a product model with ongoing model updates, QA and security.
- Pilot feedback: top problems were irrelevant comments, low accuracy and missed important issues; agents worked well for first-pass requirements analysis, comment categorisation and summaries. Agents were still triggered manually; Jira integration was in progress.
- Economics: one technical specification costs about $5,000 and 3 weeks; first tests of a spec generator show it 30-40% faster, so about 40% cheaper per spec. Bank code cannot go to the cloud, so the platform runs on self-hosted hardware and a custom in-house agent platform.
- A pilot comparison found AI generated 30% more test scenarios than one of the best test leads, and the extra scenarios were valid. Human review stays in every flow; there is no headcount-reduction goal.
How they got it
A talk with slides at an industry meetup, transcribed from Russian auto-captions with a summary. Status counts and costs come from the speaker's organisation. Comparisons are single pilots ("first tests"); no methodology, sample sizes or quality metrics are given.
Limits
- Self-reported and early; the speed and cost figures are from first tests of one generator.
- No data on accuracy, defects or rework after adoption.
- The 30% scenario comparison is one AI run against one test lead.
- Team count is inconsistent within the talk (23 and 22). Auto-captions garble some product names.
Why it matters for companies
Most enterprise AI-in-delivery programmes start the way this one did: a list of tools per function, ranked by quick efficiency wins. The talk shows why that stalls: agents need machine-readable standards, linked artefacts and an owner of the end-to-end result, and the first value comes upstream in requirements rather than in code generation. Leaders planning an AI software-delivery programme can use the failure list as a pre-mortem, and the split between generator agents and control gates as a design pattern.
Key passages in translation
Russian original
мы большая айтишка в 1000 человек, вот, которая генерит каждый день тысячи строк кода
We are a big IT company of 1,000 people that produces thousands of lines of code every day.
Russian original
мы, например, тратим на генерацию одного технического задания 5.000 долларов. Это 3 недели. Обычно это ошибки, циклы переработки.
For example, we spend 5,000 dollars producing one technical specification. That is 3 weeks, usually errors and rework loops.
Russian original
Ии сделано 30% сценариев больше. И действительно, это были нормальные сценарии.
The AI produced 30% more scenarios. And they really were sound scenarios.
Summary based on the full transcript. Read the original for the full argument and data.Watch the original on youtube.com